619 Memorial Hwy, Bismarck, ND 58504 Mon–Fri 8:00 am – 4:00 pm

A playroom and bathroom for a Lincoln family

Lincoln, ND · 2024 · Basement finishing · bathroom update. The homeowner’s task: Make the downstairs playroom ready for everyday play and update the bathroom next to it.

  • Drywall finishes and paint
  • Lighting
  • Durable flooring
Finished basement room with new drywall, lighting and wood-look floor

What HHI did

HHI updated the family’s downstairs playroom and the bathroom beside it. Fresh drywall finishes, paint, lighting and durable flooring made the main room ready for everyday play. The bathroom received an updated vanity, fixtures and finishes.

  • Drywall finishes and paint
  • Lighting
  • Durable flooring
  • Bathroom vanity, fixtures and finishes
Basement playroom with toy shelves and a play rug
Basement playroom with toy shelves and a play rug
Basement playroom with a wall-mounted TV
Basement playroom with a wall-mounted TV
Finished basement bathroom next to a playroom
Finished basement bathroom next to a playroom

Before & after

Drag the handle to compare before and after.

After: Downstairs room
Before: Downstairs room
BeforeAfter
Downstairs room
After: Downstairs bathroom
Before: Downstairs bathroom
BeforeAfter
Downstairs bathroom

Planning something similar?

Takes about a minute. Our office follows up during business hours; Viktor confirms the visit and the written scope.

Viktor with two HHI crew members

Viktor, your general contractor, coordinates your estimate

  • Our office follows up during business hours
  • Free in-home consultation in Bismarck–Mandan
  • Written estimate before any work starts

(701) 329-9659

Call Free estimate